STANDARD INCLUSIONS

Unless otherwise stated, our roofing quotations include the following as standard:

  • Supply of labour and materials as specified
  • Removal and disposal of waste generated by our works
  • Standard roof access is reasonably accessible
  • Basic weatherproofing during works where reasonably possible
  • Completion photographs where applicable
  • Basic clean-down of work areas upon completion

Unless specified or selected, the following are not included as standard:

  • Scaffolding
  • Structural timber repairs
  • Asbestos removal
  • Decorative works or internal making good
  • Specialist access equipment
  • Roof insulation upgrades
  • Builder’s works
  • Traffic management

GENERAL

All prices shown are estimates only and are subject to a site survey. Final pricing may change following inspection of the property, roof condition, access requirements, structural condition, and compliance with current regulations.

STANDARD INSTALLATION ASSUMPTIONS

Prices are based on a standard roofing installation or repair, defined as:

  • Reasonable roof access
  • Standard working hours
  • Existing roof structure suitable and safe to work on
  • No unforeseen structural or compliance issues
  • Suitable weather conditions
  • No hidden defects beyond visible inspection

Any deviation from a standard installation or repair may result in additional costs following a site survey or commencement of works.

WORKS NOT INCLUDED AS STANDARD

(Chargeable if Required or Selected)

Unless specified or selected, the following works are not included as standard and will be quoted separately if required:

  • Scaffolding
  • Structural timber replacement
  • Chimney rebuilding or structural repairs
  • Leadwork beyond the agreed scope
  • Asbestos testing or removal
  • Traffic management
  • Roof insulation upgrades
  • Skylight or rooflight replacements
  • Solar panel removal or reinstatement
  • Builder’s works
  • Internal redecorating or plaster repairs
  • Electrical works
  • Plumbing works outside the agreed scope

Access, Parking & Travel Costs

(Chargeable if Applicable)

Our quotations generally allow for standard travel costs, including parking, congestion and ULEZ charges where reasonably anticipated at the time of quotation.

However, Portman UK reserves the right to apply additional charges where unforeseen or excessive costs arise, including but not limited to:

  • Exceptional parking charges
  • Additional congestion or toll charges
  • Permit costs
  • Specialist access permits
  • Road closures
  • Restricted access requirements
  • Traffic management requirements

Any such costs will be identified and confirmed following the site survey.

MAKING GOOD & DECORATIVE WORKS

(Optional / Chargeable)

The following are not included as standard but can be provided as additional works if required:

  • Plastering
  • Painting or decorating
  • Internal making good
  • Joinery works
  • Replacement ceiling finishes
  • Replacement wall finishes
  • Replacement floor coverings

Works are limited to roofing-related items only unless otherwise agreed.

ACCESS & WORKING CONDITIONS

Unless specified or selected, the following are not included:

  • Scaffolding
  • Cherry pickers
  • Cranes
  • Traffic management
  • Road closures
  • Unsafe or restricted working conditions
  • Excessive working at height beyond standard ladder access

If specialist access is required, this will be assessed and quoted separately following the site survey.

WEATHER CONDITIONS

Roofing works are heavily dependent on weather conditions. We reserve the right to postpone works where weather conditions are unsafe or unsuitable. We shall not be held liable for delays caused by adverse weather conditions.
Temporary weatherproofing may be installed where reasonably possible during periods of poor weather.

EXISTING ROOF CONDITION & HIDDEN DEFECTS

All quotations are based on visible inspection only unless otherwise stated. Hidden defects may only become visible once roofing materials are removed. Additional works may be required where underlying defects are discovered, including but not limited to:

  • Rotten timbers
  • Structural movement
  • Water damage
  • Failed membranes
  • Inadequate historic repairs
  • Non-compliant existing installations

Any additional works identified will be discussed and quoted separately before proceeding.

ROOF LEAKS & WATER INGRESS

Tracing roof leaks can be complex due to water tracking through roofing materials and structures. Whilst every effort will be made to identify and resolve leaks, we cannot guarantee immediate identification of all sources of water ingress during initial investigations. Further investigations or additional work may be required.

LEADWORK & SPECIALIST MATERIALS

Leadwork quotations are based on standard code lead and agreed detailing unless otherwise stated. Price fluctuations in lead, timber, roofing materials, and specialist products may affect final pricing where delays occur between quotation and commencement of works.
Specialist or discontinued roofing materials may have extended lead times and additional costs.

EXISTING SERVICES & INSTALLATIONS

Unless specified or selected, quotations do not include:

  • Removal or reinstatement of solar panels
  • Satellite systems
  • Aerials
  • Air conditioning systems
  • Electrical systems
  • Pipework or plumbing services

Any specialist removals or reinstatements required may incur additional costs.

WARRANTY & LIMITATIONS

We provide a 12-month labour warranty on workmanship carried out by us unless otherwise stated. Manufacturer warranties apply to products and materials supplied and installed, and vary depending on the manufacturer and product.
This does not cover faults arising from:

  • Existing structural defects
  • Movement of the building
  • Storm damage
  • Blocked gutters or drainage systems
  • Third-party interference
  • Lack of maintenance
  • Extreme weather events
  • Pre-existing hidden defects

VARIATIONS & ADDITIONAL WORKS

Any works requested outside the agreed scope, or identified as necessary during installation or following a site survey, will be treated as a variation. All variations will be discussed and agreed upon before work proceeds and may incur additional costs.

DELAYS OUTSIDE OUR CONTROL

We shall not be held liable for delays caused by factors beyond our reasonable control, including but not limited to:

  • Weather conditions
  • Manufacturer or supplier delays
  • Third-party contractors
  • Restricted site access
  • Structural discoveries during the works

Installation dates may be adjusted accordingly.

CLIENT RESPONSIBILITIES

We will take reasonable steps to protect the immediate work area during our work.
The client is responsible for ensuring personal belongings within or near the work area are removed or adequately protected prior to commencement. The client is also responsible for ensuring suitable access and permissions are available for works.

PAYMENT TERMS

Acceptance of Quotation

Acceptance of this quotation confirms acceptance of Portman UK’s Terms & Conditions, together with the assumptions, exclusions, and payment terms detailed herein.

Deposit

Portman UK reserves the right to request a deposit of up to 50% of the quotation value prior to commencement of works.

Where a deposit is required, the amount will be clearly stated within the quotation. No materials will be ordered, and no installation dates will be secured until the required deposit has been received and cleared.

Final Payment

The remaining balance is due immediately upon completion of the works, unless otherwise agreed in writing prior to commencement.

Late Payment

Portman UK reserves the right to charge interest and reasonable debt recovery costs on overdue accounts in accordance with applicable legislation. Any costs incurred in recovering outstanding debts shall be payable by the client.

Ownership of Materials

All materials, equipment, and goods supplied by Portman UK shall remain the property of Portman UK until payment has been received in full.

Suspension of Works

Portman UK reserves the right to suspend works, withhold labour, delay attendance, and withhold commissioning, certification, warranties, manuals, and handover documentation where payments become overdue.

Variations

Any additional works requested by the client that fall outside the agreed scope shall be subject to a separate charge and may require written approval before commencement.

Access & Delays

The client shall provide suitable access, services, and permissions required to complete the works.

Delays caused by restricted access, third parties, building management, landlords, leaseholders, freeholders, managing agents, or other factors beyond Portman UK’s control may result in additional charges.

Quotations

This quotation is based upon the assumptions detailed within the quotation.

Any unforeseen conditions discovered during the works may require additional costs, which will be discussed and agreed before proceeding.

Validity

This quotation is valid for 30 days from the date of issue unless otherwise stated.

Terms & Conditions

This quotation is subject to Portman UK’s full Terms & Conditions, available at PortmanUK.com.

CANCELLATION OR POSTPONEMENT

Cancellations or postponements with less than 24 hours’ notice may be subject to reasonable charges to cover labour, materials, allocated time, or specialist equipment bookings.

RIGHT TO AMEND OR DECLINE WORKS

We reserve the right to amend pricing or decline works if works are deemed unsafe, structurally unsuitable, non-compliant, or not economically viable following a site survey or commencement of works.